PRESENTATION
Flood hazard assessment and mitigation measures
1:15:56
·
42 sec
The presentation addresses flood hazard concerns and outlines mitigation measures. The area is described as having minimal flood hazard, with only a small portion in the 0.2% floodplain.
- No records of underground streams in the area
- Floodproofing measures include dry floodproofing, anchoring foundations, using flood-resistant materials, and implementing flood mitigation systems
Neil Weisbard
1:15:56
This area is in an area of minimal flood hazard.
1:16:00
And there was a small portion, very small portion that's located within the point 2% floodplain.
1:16:06
There are no records of underground streams in the area.
1:16:09
And the project architect, if there is any water issues during construction has over 40 years of experience in this area constructing floodproof buildings.
1:16:18
Next slide.
1:16:21
Floodproofing measures include dry floodproofing areas below grade, utilizing anchoring the foundations to the vials to prevent flotation, utilizing flood damaged resilient materials, and utilizing flood mitigation measures such as steel gate system.
1:16:37
And next slide.