PRESENTATION
Traffic and access considerations for the 500 Kent Avenue development
0:45:04
·
78 sec
The presentation addresses traffic and access considerations for the project, including parking and loading dock arrangements. These aspects were developed in collaboration with city planning and the Department of Transportation.
- Parking entrance relocated to Division Avenue
- Loading dock designed with a head-in, head-out configuration on Kent Avenue
- Measures taken to ensure safe crossing and visibility for vehicles entering and exiting the site
- Considerations made for the bike lane on Kent Avenue and neighborhood traffic flow
Nebil Gokcebay
0:45:04
Next, Next slide.
UNKNOWN
0:45:07
So this
Nebil Gokcebay
0:45:09
let me double log in.
0:45:12
So this slide is the same section we saw before.
0:45:15
This illustrates all the access points mentioned before for pedestrians, but also illustrates the parking entrance to the north along division.
0:45:25
As well as the required loading dock, which is located on Kent.
0:45:30
So that was kinda worked through a lot with both city planning and with DOT for how to kinda navigate the the bike lane on Kent.
0:45:42
And the traffic through and around the neighborhood.
0:45:44
So the the parking originally had 2 entrances, one on one of division.
0:45:50
Parking entrance was relocated to division and the loading dock you'll see on the next slide.
0:45:57
Next slide.
0:45:58
It's designed as a head in, head out configuration.
0:46:01
So vehicles entering the site for for loading purposes are always in full line of sight for anything they're crossing.
0:46:08
There's no one backing in or out of the site.
0:46:12
To make sure it's the the safe of this crossing it can be.
0:46:15
And That's next slide.